Short and sweet
This week: Short and sweet;

This week’s blog is going to be short, because of the weather!
We have had six wet days this week, with 75.4mm or 75.4 litres of rain per square metre. Don’t get me wrong, we need the rain, however when on some days, it has rained from sunrise to sunset and I have needed lights on all day, you can get too much of a good thing…

The soils are now nicely wet, not too much, but of course we are now in winter, so plants which needed rain in the summer, are no longer growing so cannot use the moisture.
The underlying rock is mostly limestone, so porous. This means that there are no underlying aquifers where rainwater is stored. Instead the rain percolates down through the rock, way beyond the depth that trees and plants can reach with their roots.
It doesn’t help that my soils are shallow, so they heat quickly and don’t retain moisture.
Remember two weeks ago when I was putting winter protection on my polytunnel?

I thought I had found a solution to fitting eyelets to the polythene winter cover for my polytunnel, when I found an independent set of punches and dies, together with ringlets for sale on Temu. I ordered a set and it was delivered this week.
With the sun shining on Saturday (before more rain is forecast for Sunday!) I was working on fitting the 2 x 8 metre plastic sheeting.
I decided that the best way would be to fix one end and then unroll the plastic sheet, punching the holes and installing the ringlets as I went.

not such a good idea!
The first part of fitting was not too difficult as I had already fitted two ringlets. I secured them in place with butterfly nuts and then unrolled the plastic, marking the position of each hole with a marker pen.
However as soon as I tried to fit the first ringlet in the middle of the 2 metre width of plastic, I found that the tool I had bought was not working as I expected.

I wasn’t sure which way I was supposed to install the securing ring. Hitting the punch-down tool with a hammer was not producing the kind of neat result I was getting with the hand tool I have for crimping, near the edge of the sheet.
Whilst my idea of unrolling the polythene and installing the ringlets as I did, sounds good, the practice was somewhat different. It didn’t work!
As Saturday wore on, my progress got slower and my frustration built. After lunch, I decided to pack up. It is going to be easier to try and fit the eyelets, off the polytunnel, flat on the floor.
At this time of year, we are almost at the peak of the Mediterranean “winter mild and wet” season, so a lack of progress outside is to be expected.
I have actually had a complaint about my bi-weekly weather forecasts… They are too accurate and there is too much rain. People want sunshine instead!
I’m afraid it will be a couple of months before we notice the sun climbing higher in the sky again. NCG